More progress on the Cafe. I managed to get the foundation built, signage installed, and window glazing in:





Still left to do: Boardwalk planks and steps for the front, trim for the sign, and an awning to shade the front porch.

I've installed my SPDT switch throws, and the electrical continuity of the layout is MUCH better by comparison. As of this writing, ALL of the wiring is now complete, and the layout is running great.



I'm going to scratchbuild scale-sized switch stands to disguise the slide switches, much like these DR&GW "short" stands.



Finally, I'll get to move on to painting track and tackling scenery, which is my favorite part of the hobby!