You can see in the last shot the raw India Ink stain, as I figured the back of the false-front facade wouldn't have been painted.
I installed the roof and dry-fitted the windows. I also began applying the Bar Mills shingles, which look very convincing.
I decided to enlarge the opening for the front door to accommodate a taller door with a transom window above it. The door will be painted white, with the light blue trim.
Getting close to finished on this build. What's left?
-Paint and install the front door
-Finish shingles
-Fabricate and install kitchen smoke-jack
-Fabricate and install Cafe sign
-Fabricate and install front porch awning and boardwalk
This has been a good ramp-up project to get myself excited about completing the structures on the layout. I also have to tackle the Hotel, a small water-tower, and decide which direction I'd like to go on the industrial spur near the depot.
No comments:
Post a Comment